Disclaimer:

Some parts of this website are currently undergoing development, but exciting updates are on the way. Stay tuned for an exhilarating experience that will keep you captivated! Fair winds and following seas, The DST.news Team.
1 2 3 … 22
Home > All news > Shipping > Six firms show interest for outer harbour development at VOC Port in Thoothukudi

Six firms show interest for outer harbour development at VOC Port in Thoothukudi

July 13, 2022
Reading Time: 2 minutes
THOOTHUKUDI: Six firms, including a Swiss terminal operator, have responded to the call for Expressions of Interest for the 
Rs. 7,164-crore outer harbour project at the VO Chidambaranar Port in Thoothukudi to be built on on design, build, finance, operate and transfer basis. The Centre has revived the project, which was first announced in 2013, with a capacity to handle 
4 million TEUs (twenty-foot equivalent unit) annually.
The firms that have evinced interest in the project are Terminal Investment ltd, Switzerland; International Seaport Dredging, Chennai; Megha Engineering & Infrastructures ltd, Telangana; Orissa Stevedores ltd, Odisha; Premium & JV partners, Branch UAE and Amma Lines Pvt Ltd, Mumbai, said officials.
Infrastructure planned
The VOC Port Authority plans to develop the outer harbour with two continuous quays of 1,000 m each. 
It has already entrusted the work to prepare the Detailed Project Report to the National Technology Centre for Ports, Waterways & Coasts, and in the process of appointing the transaction advisor. On receipt of the DPR, action will be initiated to submit the proposal for government approval, they said.
The container traffic at the 
VOC Port has increased to 7.81 lakh TEUs in 2020-21 from 6.92 lakh TEUs in 2018-19. The recent traffic forecast study done by consultants shows that the future traffic growth at the port will depend heavily on container traffic. This necessitates the development of an outer harbour.
The two existing Container Terminals — PSA Sical and Dakshin Bharat Gateway — can accommodate vessels up to 320 m in length with a draft restriction of 11.7 m. Berth 8 can accommodate vessels up to 310 m with a draught of 14.2 m. This can handle container ships of less than 5,000 TEUs.
However, with the size of the container ships increasing globally, there is a need to substantially increase the infrastructure to handle 22,000 TEU vessels which need a draught of around 20 m, said an industry source.
FOLLOW US ON SOCIAL MEDIA
Today's News
Follow us
facebook | DST NewsTwitter | DST NEWSlinkedin | DST NEWSInstagram | DST NEWSYouTube | DST NEWS
© DAILY SHIPPING TIMES
Back
Home
crosschevron-down

You cannot copy content of this page

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram