Disclaimer:

Some parts of this website are currently undergoing development, but exciting updates are on the way. Stay tuned for an exhilarating experience that will keep you captivated! Fair winds and following seas, The DST.news Team.
1 2 3 18
Home > All news > Shipping > Lift & Shift delivers Critical Equipment for IOCL Paradip

Lift & Shift delivers Critical Equipment for IOCL Paradip

April 20, 2021
Reading Time: 2 minutes

HAZIRA: Lift and Shift India Pvt. Ltd, (LSPL) a leading Heavy-lift operator and Project Logistics company in India operating over 7 decades, have delivered another milestone by transporting safely 15 Heavy-lift & Over-Dimensional equipment

from L&T Hazira for Indian Oil Corporation Ltd (IOCL), Paradip Refinery, one of prestigious projects of Government of India. 

Larsen & Toubro Hydrocarbon Engineering (LTHE) was the EPC company for the project and was awarded the contract for expansion of Mono Ethylene Glycol (MEG) plant and Ethylene Recovery unit (ERU) which included critical Heavy lift & ODC equipment from their yard in Hazira, Gujarat.

Lift & Shift India was contracted by All Cargo Logistics Ltd for movement of 15 Heavy lift & ODC equipment from the fabrication facility in Hazira to Adani Hazira Port. 

The cargo was shipped in two lots which involved Land and Marine transport using LSPL 250 class barge in 3 voyages from Larsen & Toubro Jetty to Adani Port Hazira.

The Critical and Challenging equipment was transporting of the EO Reactor weighing 1200 MT and 2 Columns of 100 m length. The length of the 2 column required the RORO jetty at L&T Hazira facility to be modified and levelled to meet “zero” degree elevation against the actual jetty which is inclined and suited shorter equipment.

The EO Reactor was transported on 3 side by side axles using a total 66 SPMT axles. The Barge AF 250 loaded 2 Nos 100 m columns were flagged off by Mr. Dharmendra Pradhan the Cabinet Minister for Petroleum & Natural Gas in the Government of India.

Lift & Shift’s expertise team was involved in meticulous planning from beginning to optimise the road and marine movement from Larsen & Toubro fabrication facility to Hazira port which is one of the keys for successful execution of the project.

FOLLOW US ON SOCIAL MEDIA
Today's News
Follow us
facebook | DST NewsTwitter | DST NEWSlinkedin | DST NEWSInstagram | DST NEWSYouTube | DST NEWS
© DAILY SHIPPING TIMES
Back
Home
crosschevron-down

You cannot copy content of this page

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram