


MARSEILLE : CMA CGM has taken delivery of its second 24,000 TEU liquefied natural gas (LNG)-powered container vessel constructed by China’s Hudong-Zhonghua Shipbuilding.
CMA CGM Saint Germain was handed over during a ceremony held on June 6, after which it is to be deployed on the FAL service, connecting Asia and Europe. The newbuild features an overall length of 399 meters and a width of 61.3 meters.
Having been fitted with an engine that can run on a sustainable fuel like . . .
Disclaimer: This information has been collected through secondary research and Daily Shipping Times is not responsible for any errors in the same.


You cannot copy content of this page