Disclaimer:

Some parts of this website are currently undergoing development, but exciting updates are on the way. Stay tuned for an exhilarating experience that will keep you captivated! Fair winds and following seas, The DST.news Team.
1 2 3 21
Home > All news > J M Baxi Group completes CERES Project at L&T Kattupalli

J M Baxi Group completes CERES Project at L&T Kattupalli

5 hours ago
Reading Time: < 1 minute

Mumbai - JM Baxi Group has announced the successful completion of the CERES Project at L&T Kattupalli (MFFK).  A technically challenging heavy transportation and marine loadout project delivered through detailed engineering, precise SPMT planning and disciplined field execution.

The project involved the movement and loadout of 110 modules across 23 LOTs, totalling 64,000 MT, supported by 120 Scheuerle Generation 4 SPMT axles and 5 vessels.

From load distribution and internal shifting to positioning and vessel loadout, every stage was carefully engineered around varying load requirements, site constraints, equipment availability and operational . . .

Want to read full article?

Disclaimer: This information has been collected through secondary research and Daily Shipping Times is not responsible for any errors in the same.

FOLLOW US ON SOCIAL MEDIA
Today's News
Follow us
facebook | DST NewsTwitter | DST NEWSlinkedin | DST NEWSInstagram | DST NEWSYouTube | DST NEWS
© DAILY SHIPPING TIMES
Back
Home
crosschevron-down

You cannot copy content of this page

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram